In 2018, as part of an effort to keep up with the rapid growth and development of the Washington, D.C. Metro Area, RH Steel Erectors began its work for the Metropolitan Washington Airport Authority (MWAA) to assist in replacing the outdated 30-year-old toll collecting system that is currently in place.
As an integral part of this massive effort, which spans across 50 toll lanes and 20 toll plazas, RH Steel Erectors is tasked with handling all things steel: from the removal of the previous structures, to the fabrication and installation of their replacements.